- ONGOING UNDER CONSTRUTION:
-
Additional Late Applicant Fund (ALAF) for Serian Division Phase 3
-
Projek Rakyat on RES Last Miles, Phase 3 for Areas in Mukah Division
Discussion with JKR Sibu
Dialogue Session at Sg. Passin, Mukah
-
Additional Late Applicant Fund (ALAF) for Serian Division Phase 3
- COMPLETED:
-
Projek Rakyat on RES Last Miles, Phase 1A and 1B for Areas in Sri Aman and Betong Division
Boat ride to longhouse at Ulu Lemanak
Road condition towards Ulu Lemanak
Construction of Substation for Rh. Ong Lum Pong
Installation of Mains Wiring to LT Line for Rh. Lamada and Rh. Nunong
Rh. Entering Successful Energized
Dialog Session for Internal Wiring at Rh. Lamada
Dialogue Session with the villagers at Rh. Unang
-
Projek Rakyat on RES Last Miles, Phase 1A and 1B for Areas in Sri Aman and Betong Division
- ONGOING UNDER CONSTRUTION:
-
Consultancy Services for Design and Installation of 33kV Covered Conductor Line for Kemantan-Pakan, Sarikei under Rural Electrification Project
Consumer Survey Works
Site Discussion with Contractor
Dialogue session with the District Office Meradong and villagers
Road reserve pegging
-
Consultancy Services for Design and Installation of 33kV Covered Conductor Line for Kemantan-Pakan, Sarikei under Rural Electrification Project
- ONGOING UNDER CONSTRUTION:
- 12th Malaysia Plan (12MP), Physical Study For The Suitability Of The Construction Project For 33kv
Medium Voltage Covered Conductor (Mvcc) From Gaat Tunoh And 33kv Substation At Tunoh Town
- Including Power System Study
- 12th Malaysia Plan (12MP), Physical Study For The Suitability Of The Construction Project For 33kv
Medium Voltage Covered Conductor (Mvcc) From Gaat Tunoh And 33kv Substation At Tunoh Town
- PROPOSAL STAGE:
-
Proposed 18.72 KWp Grid-Connected Solar PV System for NEM
-
Proposed 18.72 KWp Grid-Connected Solar PV System for NEM
- COMPLETED:
-
The Design, Engineering, Procurement,
Construction, Installation, Testing &
Commissioning (EPCC) For The Development Of
Selco Solar Photovoltaic Plant At Selected
Locations In Selangor
5 Water Treatment Plant ( Total 445.74 KWp )
a. Rumah Pam Desa Putra 41.04 KWp
b. Rumah Pam Bukit Jelutong 132.24 KWp
c. Intake Sungai Labu 86.64 KWp
d. WTP Ampang Intake 54.72 KWp
e. Rumah Pam Kepong Estate 131.1 KWp
- The Supply, Delivery, Installation, Testing and Commissioning of SARES Phase 4A Solar Power Projects in Ulu Tinjar ( 133 KWp)
- The Supply, Delivery, Installation, Testing and Commissioning of SARES Phase 5B Solar Power Projects in Marudi, Miri, Sarawak (Kuala Tutoh)( 134 KWp )
- Supply, Deliver, Installation, Testing And Commissioning Of Sares Phase 2 Solar Power Projects In Marudi B, Sarawak (100 KWp)
-
The Design, Engineering, Procurement,
Construction, Installation, Testing &
Commissioning (EPCC) For The Development Of
Selco Solar Photovoltaic Plant At Selected
Locations In Selangor
- COMPLETED:
-
Survey Works for Design Proposal for RES Project at New Lawas EHV Substation to Long
Luping proposed Ba'Kelalan Substation
Road condition towards Long Luping while doing design proposal to Long Luping
Lawas Town 275/33kV Substation
- Survey Works for Design and Installation of 33kV Covered Conductor Lines for Kapit-Baleh, Phase 2 from Mujong to Gaat
- Survey Works for Design and Installation of 33kV Covered Conductor Lines for Long Luping to Ba'Kelalan
- Survey Works for Supply, Laying and Termination of 33kV Submarine Cable at Muara Lassa River, Daro, Central Region
-
Survey Works for Design Proposal for RES Project at New Lawas EHV Substation to Long
Luping proposed Ba'Kelalan Substation
- ONGOING:
- Consultancy Services Design For Proposed Design for New Hakka Centre Cum Multi-Story Parking
- Design, Supply, Delivery, Installation, Testing And Commissioning Of Automated Storage And Retrieval System (ASRS) At State Archive Sarawak, Construction And Completion Of The Proposed State Archived Building On Lots 1551, 1555, 1607, 2645, 3272, 3274, 3275 And Part Of 2646, 2647, 3276, 3278, 3279 & 3280, Block 18 Salak Land District Kuching Sarawak
-
Consultancy Services Design Unit Lapang Sasar, Sempadi
- DESIGN STAGE COMPLETED:
-
Upgrading of Fire Protection System (Tanks and
Associated Equipment) for Senari Terminal
- ONGOING UNDER CONSTRUTION:
-
Central Living Quarters for SSLR 2 Project,
Mendamit Limbang
-
Proposed Renovation of Madrasah Darul Uloom
Islamiyyah, Kampung Rampangi, Jalan
Santubong, Kuching.
-
Central Living Quarters for SSLR 2 Project,
Mendamit Limbang
- COMPLETED:
-
Supply of Manpower for Pengurusan Lebuh Raya
Pan Borneo Sarawak (PLPS)
-
Lot 2258, Block 17, Salak Land District, Kuching. Double-Storey Housing Terrace Development
-
Proposed Borneo Intergrated Shorebase on Part
of Lot 1245, Block 20, Kemena Land District, at
Tanjong Kidurong, Bintulu
-
Cadangan Membina Surau Darul Iman, Lorong
Cenderawasih 6 di atas Lot 1498 Blok 17 Salak
Land District, Semariang, Kuching
- Project Management for External Electrical Services for the Proposed Infrastructure for Darul Hana Development Block 2A at Jalan Demak, Kuching
-
Power Relocation Works (PRW) under Pan Borneo
Highway Projects - Handover audit and
submission to client's consultant for all WPCs
(WPC02-WPC11)
Audit Site Check at WPC 08
PRW site at WPC 09
- Lot 20 Matang - Proposed Design for Power and Telco Services
- Proposed Borneo Intergrated Shorebase on Part of Lot 1245, Block 20, Kemena Land District, at Tanjong Kidurong, Bintulu
-
Cadangan Membina Surau Darul Iman, Lorong
Cenderawasih 6 di atas Lot 1498 Blok 17 Salak
Land District, Semariang, Kuching
Exterior view of ‘new’ Surau Darul Iman that has since been demolished and is to be rebuilt
Interior view of ‘new’ Surau Darul Iman that has since been demolished and is to be rebuilt
-
Project Management for External Electrical
Services for the Proposed Infrastructure for
Darul Hana Development Block 2A at Jalan
Demak, Kuching
Project Management for External Electrical Services at Jalan Demak, Kuching
-
Supply of Manpower for Pengurusan Lebuh Raya
Pan Borneo Sarawak (PLPS)
- ONGOING CONSTRUCTION STAGE:
-
Proposed Development of Telecommunication
Infrastructure and Facilities under Major Contributor
Project (Clawback) In Sarawak
- Design, Supply, Delivery, Installation, Testing and Commissioning of Commercial Power Supply (CPS) including application of SESCO’s meter - SEE Energy
- Design, Supply, Delivery, Installation, Testing and Commissioning of Commercial Power Supply (CPS) including application of SESCO’s meter - Mazmur Teknikal Sdn Bhd
- Design, Supply, Delivery, Installation, Testing and Commissioning of Commercial Power Supply (CPS) including application of SESCO’s meter - Empayar Holding Sdn Bhd
- Design, Supply, Delivery, Installation, Testing and Commissioning of Commercial Power Supply (CPS) including application of SESCO’s meter - Shorefield Sdn Bhd
- Design, Supply, Delivery, Installation, Testing and Commissioning of Commercial Power Supply (CPS) including application of SESCO’s meter - Hankong Electrical Sdn Bhd
- Consultancy Services for Design, Supply, Delivery, Installation, Testing and Commissioning for Five (5) Smart Sites (Ng. Banjor, Ng. Sekukut, Sg. Menuan, Rh. Kahai and Long Dungun)
-
Proposed Development of Telecommunication
Infrastructure and Facilities under Major Contributor
Project (Clawback) In Sarawak
- ONGOING:
- The Design, Engineering, Procurement, Construction, Installation, Testing & Commissioning (EPCC) For The Development Of Selco Solar Photovoltaic Plant At Selected Locations In Selangor
- COMPLETED:
-
The Supply, Delivery, Installation, Testing and
Commissioning of SARES Phase 4A Solar Power
Projects in Ulu Tinjar
Internal Wiring Testing at Long Ukok, Ulu Tinjar
Internal Wiring Testing at Long Ukok, Ulu Tinjar
-
The Supply, Delivery, Installation, Testing and
Commissioning of SARES Phase 5 Solar Power
Projects in Marudi, Miri, Sarawak (Kuala Tutoh)
Power House for Battery Storage & Inverter Kg Benawa (54KWp)
Power House for Battery Storage & Inverter Kg Benawa (54KWp)
Solar PV Panel – Long Tebangan (55KWp)
-
The Supply, Delivery, Installation, Testing and
Commissioning of SARES Phase 4A Solar Power
Projects in Ulu Tinjar